登录注册
Tue May 21 05:13:20 CST 2024 会员服务 用户名: 密码: 注册  忘记密码 客服电话:4006728810 首页 法律咨询 案件委托 找好律师

合同文规库

您当前的位置:法律家首页>>合同文规库>>合同范本详情页

CONTRACT FOR PROCESSING

加工定作合同-承揽合同  |  2015-07-24 18:10:07.183


  Messrs: _________________________________
    INDUSTRY LTD. (hereinafter called Party A)
  and
  INDUSTRY LTD. (hereinafter called Party B)
  have agreed that Party B shall manufacture Standard Magnetic
  Compasses in____________ with all necessary parts and materials supplied by Party A under the following terms and conditions:
  1. Commodity and quantities for processing with supplied materials and assembling with supplied parts:
  (1) Commodity-Standard Magnetic Compass;
  (2) Quantity-____________sets in total.
  2. All necessary parts and materials listed in the contract shall either be supplied by Party A or purchased in ____________ or by Party B;
  3. The processing charge for each model is as follows:
  (1) Standard Magnetic Compass of Type GLC-1 at U. S. $
  ____________(SAY: _________________U. S. D) each;
  (2) Standard Magnetic Compass of Type GLC-2 at U. S. $
  _____________(SAY: ________________ U. S. D) each;
  (3) Standard Magnetic Compass of Type GLC-3 at U. S. $
  ____________(SAY: ___________U. $. D) each.
  4. The main parts, consumables and materials required for processing will be sent to (place) by Party A and if there is any shortage or damage, Party A should be held responsible for supplying replacements;
  5. Party A should pay Party B by L/C or T/T covering the full amount of processing charges and costs of parts, consumables and materials purchased in__________or____________by Party B one month before shipment of the finished products;
  6. Party B must complete the manufacturing of all Standard Magnetic Compasses of type GLC-1 and effect shipment within the agreed date without delay except in the occurrence of uncontrollable and unforceeable events ;
  7. The damage rate of parts and materials:
  The damage rate of parts and materials in processing is __________% and such a damage rate of parts and materials shall be supplied free by   Party A, should the damage rate exceed _____________ % , Party B shall supply additional materials
and necessary parts;
  8. Should shipment of

........................

版权所有:法律家科技集团 运营维护:法绿家科技(北京)有限公司
用户登录